Read the Beforeitsnews.com story here. Advertise at Before It's News here.
Profile image
By ProactiveInvestors (Reporter)
Contributor profile | More stories
Story Views
Now:
Last hour:
Last 24 hours:
Total:

Millennial Lithium eyeing commissioning of Pastos Grandes pilot plant in December this year

% of readers think this story is Fact. Add your two cents.


Millennial Lithium Corp (CVE:ML) (OTCQB:MLNLF) is making good progress at the Pastos Grandes project in Argentina and expects to start treating brine at its pilot plant in December this year to produce battery-grade lithium carbonate.

In a wide-ranging update on Thursday, the company revealed current work at the site in Salta province, included ongoing liming and feeding of brine to pilot ponds, the building of the pilot plant and an additional long-term pumping well test.

READ: Millennial Lithium files positive feasibility study for Pastos Grandes

It is aimed that the pilot operation will produce around 3 tonnes per month of battery grade lithium carbonate and includes a final purification stage to ensure consistent production.

“We are very pleased with the progress to date at our Pastos Grandes project, noted Farhad Abasov, Millennial’s president and CEO, in a statement.

“The commissioning of the pilot plant facility will be an important milestone for the Company as we will produce battery grade lithium carbonate by basically duplication of the commercial design for the company’s 24,000 tonne per year lithium carbonate plant outlined in the feasibility study.”

Abasov added that he was also encouraged by progress in the group’s application for fiscal stability protection, meaning it was confident in government support for the project for the next three decades.

Notably, he said the firm was also “actively advancing financing, offtake and other strategic talks with large industry players”.

The liming plant is now fully operational and treating up to 100 square metres of brine per day, which then goes to a large holding pond for concentration of the lithium.

To support the previous feasibility study, a long-term, constant rate pumping test of 15 days was completed at one well at the project and the results, along with 2017 testwork, support the previous assumptions that large flow rates are possible in this part of Pastos Grandes.

Fiscal stability

Millennial also confirmed in today’s statement that it was covered under the benefits of fiscal stability under national law, which fixes the maximum overall tax rates and brings additional benefits for Millennial for 30 years.

“Millennial originally applied for fiscal stability in Q4 2018; meetings this week with the mining secretary and his deputies indicate final approval has been granted, with the delivery of the final signed resolution in early Q4 2019,” the company said in the statement.

A feasibility study for the project has envisaged production of 24,000 tonnes per year (TPY) of battery-grade lithium carbonate – over 99.5% lithium carbonate equivalent (LCE) – and puts the total initial capital expenditure required at US$448.2 million, including direct and indirect costs.

The study is based on an operation using proven solar evaporation technology and conventional lithium brine processing and it puts the projected mine life at 40 years.

The net present value (NPV) was put at US$1,030 million after-tax at an 8% discount rate and an internal rate of return (IRR) of 24.2%.

Contact the author at [email protected]

Story by ProactiveInvestors


Source: https://www.proactiveinvestors.com/companies/news/903054/millennial-lithium-eyeing-commissioning-of-pastos-grandes-pilot-plant-in-december-this-year-903054.html


Before It’s News® is a community of individuals who report on what’s going on around them, from all around the world.

Anyone can join.
Anyone can contribute.
Anyone can become informed about their world.

"United We Stand" Click Here To Create Your Personal Citizen Journalist Account Today, Be Sure To Invite Your Friends.

Please Help Support BeforeitsNews by trying our Natural Health Products below!


Order by Phone at 888-809-8385 or online at https://mitocopper.com M - F 9am to 5pm EST

Order by Phone at 866-388-7003 or online at https://www.herbanomic.com M - F 9am to 5pm EST

Order by Phone at 866-388-7003 or online at https://www.herbanomics.com M - F 9am to 5pm EST


Humic & Fulvic Trace Minerals Complex - Nature's most important supplement! Vivid Dreams again!

HNEX HydroNano EXtracellular Water - Improve immune system health and reduce inflammation.

Ultimate Clinical Potency Curcumin - Natural pain relief, reduce inflammation and so much more.

MitoCopper - Bioavailable Copper destroys pathogens and gives you more energy. (See Blood Video)

Oxy Powder - Natural Colon Cleanser!  Cleans out toxic buildup with oxygen!

Nascent Iodine - Promotes detoxification, mental focus and thyroid health.

Smart Meter Cover -  Reduces Smart Meter radiation by 96%! (See Video).

Report abuse

    Comments

    Your Comments
    Question   Razz  Sad   Evil  Exclaim  Smile  Redface  Biggrin  Surprised  Eek   Confused   Cool  LOL   Mad   Twisted  Rolleyes   Wink  Idea  Arrow  Neutral  Cry   Mr. Green

    MOST RECENT
    Load more ...

    SignUp

    Login

    Newsletter

    Email this story
    Email this story

    If you really want to ban this commenter, please write down the reason:

    If you really want to disable all recommended stories, click on OK button. After that, you will be redirect to your options page.