Read the Beforeitsnews.com story here. Advertise at Before It's News here.
Profile image
Story Views
Now:
Last hour:
Last 24 hours:
Total:

Concrete work advances $700M Mississippi River bridge in St. Louis

% of readers think this story is Fact. Add your two cents.


 

The new $229 million Mississippi River bridgeis taking shape as both its towers have reached 200 feet in height, half their eventual height of 400 feet, according to theMissouri Department of Transportation (MoDOT).

Some 10 truck loads of concrete were added to the structures Monday, the agency said. Construction on the towers is projected to be complete in late spring. After that, crews will begin placing the cables, which are about 50 miles in length, and framework for the driving service. When completed, the bridge will span 1,500 feet, making it the third-longest cable-stayed bridge in the country.

The approximately $700 million Mississippi River bridge project not only includes the bridge itself, but also the relocation of interchanges on both the Illinois and Missouri sides of the river. The bridge project wasawarded to a joint venture comprised of St. Louis-based Alberici Corp ., Massman Construction Co. of Kansas City and Traylor Bros. Inc. of Indiana.

The bridge was projected to create nearly 3,000 direct and indirect jobs in the metro area. The new span is expected to rejuvenate the surrounding area and could spur about $25.3 billion inregional economic activity in the next 45 years.

http://www.bizjournals.com/stlouis/news/2012/01/10/mississippi-river-bridge-reaches-200.html

smartbrief.com



Before It’s News® is a community of individuals who report on what’s going on around them, from all around the world.

Anyone can join.
Anyone can contribute.
Anyone can become informed about their world.

"United We Stand" Click Here To Create Your Personal Citizen Journalist Account Today, Be Sure To Invite Your Friends.

Please Help Support BeforeitsNews by trying our Natural Health Products below!


Order by Phone at 888-809-8385 or online at https://mitocopper.com M - F 9am to 5pm EST

Order by Phone at 866-388-7003 or online at https://www.herbanomic.com M - F 9am to 5pm EST

Order by Phone at 866-388-7003 or online at https://www.herbanomics.com M - F 9am to 5pm EST


Humic & Fulvic Trace Minerals Complex - Nature's most important supplement! Vivid Dreams again!

HNEX HydroNano EXtracellular Water - Improve immune system health and reduce inflammation.

Ultimate Clinical Potency Curcumin - Natural pain relief, reduce inflammation and so much more.

MitoCopper - Bioavailable Copper destroys pathogens and gives you more energy. (See Blood Video)

Oxy Powder - Natural Colon Cleanser!  Cleans out toxic buildup with oxygen!

Nascent Iodine - Promotes detoxification, mental focus and thyroid health.

Smart Meter Cover -  Reduces Smart Meter radiation by 96%! (See Video).

Report abuse

    Comments

    Your Comments
    Question   Razz  Sad   Evil  Exclaim  Smile  Redface  Biggrin  Surprised  Eek   Confused   Cool  LOL   Mad   Twisted  Rolleyes   Wink  Idea  Arrow  Neutral  Cry   Mr. Green

    MOST RECENT
    Load more ...

    SignUp

    Login

    Newsletter

    Email this story
    Email this story

    If you really want to ban this commenter, please write down the reason:

    If you really want to disable all recommended stories, click on OK button. After that, you will be redirect to your options page.