Read the Beforeitsnews.com story here. Advertise at Before It's News here.
Profile image
Story Views
Now:
Last hour:
Last 24 hours:
Total:

If there’s demand for a night train on a route, and a night train could be profitable, how can it be that no-one runs it?

% of readers think this story is Fact. Add your two cents.


One of the questions I am often asked when discussing rail travel in the European Union is why there is no night train on a given route. “People would take it!” I am told, and I do not doubt that. It is not the demand side that is necessarily the problem. It is the supply side – no-one wants to run the service, even if a night train could be profitable. In this blog post I am going to explain why, even if a service would be profitable, it still does not mean the service will run.

I will explain why this is the case using the example of the Paris-Barcelona route.

There are two direct TGV daytime trains each way each day on this route, taking 6 hours 25 minutes. Details of these services are here. That is longer than most people will spend sat in a train, especially business travellers. So a night train would be an option on this route.

But let’s look at the financial choices facing the company running the service, SNCF.

The cost to run a train is relatively fixed once the service has been established – the track access charges and staffing costs remain pretty much unchanged whether your train has a single person on board, or has every seat filled. The economics of the daytime trains look something like this*:

Let’s then imagine a night train was introduced on this route (night trains Paris-Barcelona ran between 1969 and 2013), with a trip time of around 11 hours – as night trains cannot use the high speed lines TGVs use. At night this is not a problem though – departure from Paris at around 21:00, arrival in Barcelona at 08:00. But the additional staffing costs for a longer trip, plus the additional operating complexity of changing a locomotive at the border (not necessary with a TGV) push costs up for the night train. So the economics for this one would look like this:

But this is not a zero sum game.

Each TGV has 500 seats, and a night train around 300 seats/berths. Let’s imagine that an average of 50 TGV passengers take the night train instead of the TGV. That leaves the economics for the TGV looking like this:

The profit lost through the introduction of the night train is greater than the profit gained from running it!

Or to put it another way, if you are in the shoes of SNCF, what do you do?

You can run two TGVs each day, with 500 seats, average occupancy 80% (so transporting 800 passengers total), or run two TGVs and one night train, average occupancy 70% (so transporting 910 passengers total), but making less profit.

In other words, rail’s market share on the route would have increased were a night train introduced, but the profit for SNCF would have decreased. If you’re SNCF management it’s a no brainer – you don’t run the night train.

You could I suppose try to apply some public or political pressure to SNCF – and that to some extent worked with regard to national night train routes within France – but SNCF behaves like the most ruthless capitalist firm when it comes to its international operation, so I cannot see a kind of service publique ethical argument working here.

But hang on, you are probably thinking, how about finding someone else to run the train?

Sadly that is not at all simple. You could start with Renfe, Spain’s publicly owned railway firm. But they have entered into what amounts to a non-aggression pact with SNCF for France-Spain daytime services, with SNCF running Paris-Barcelona, and Renfe running the other services (Madrid-Marseille, Barcelona-Toulouse, Barcelona-Lyon). Renfe also only has its low capacity Ave 100 trains that can operate into France, and is meanwhile selling its remaining night train stock to India. So that’s a non-starter.

Were anyone else – one of the night train insurgents like Snälltåget or European Sleeper for example – to try to run a Paris-Barcelona night train they would face a series of hurdles, foremost among them the absence of rolling stock (especially anything compatible with 1668mm Iberian gauge), or operational hurdles to run a low speed night train on the standard gauge high speed line from Perpignan to Barcelona. I have explained more about the rolling stock headaches in this post about scaling night trains, and wondered whether the EU could solve this problem in this post.

Is there anything else that could be done?

The only real way to reduce the fixed costs of running night train services would be to reduce track access charges for them (France has done this for freight during the COVID pandemic) – that could perhaps entice companies like SNCF back into the international night train business, but it would still leave the rolling stock problem unaddressed.

Anyway, so there you have it. Even were a Paris-Barcelona night train profitable, that does not mean one will run – because for SNCF it would reduce its margins on its daytime trains, and no other firm is in a position to operate such a service instead. We, European railway passengers, and citizens wanting a green and time efficient way to travel in Europe, all lose as a result. It’s high time for the European Union to solve this conundrum!

* – I have no way of knowing exactly what the occupancy rate is, or the break even point. I have taken educated guesses here for the numbers in these diagrams.

The post If there’s demand for a night train on a route, and a night train could be profitable, how can it be that no-one runs it? appeared first on Jon Worth Euroblog.


Source: https://jonworth.eu/if-theres-demand-for-a-night-train-on-a-route-and-a-night-train-could-be-profitable-how-can-it-be-that-no-one-runs-it/


Before It’s News® is a community of individuals who report on what’s going on around them, from all around the world.

Anyone can join.
Anyone can contribute.
Anyone can become informed about their world.

"United We Stand" Click Here To Create Your Personal Citizen Journalist Account Today, Be Sure To Invite Your Friends.

Please Help Support BeforeitsNews by trying our Natural Health Products below!


Order by Phone at 888-809-8385 or online at https://mitocopper.com M - F 9am to 5pm EST

Order by Phone at 866-388-7003 or online at https://www.herbanomic.com M - F 9am to 5pm EST

Order by Phone at 866-388-7003 or online at https://www.herbanomics.com M - F 9am to 5pm EST


Humic & Fulvic Trace Minerals Complex - Nature's most important supplement! Vivid Dreams again!

HNEX HydroNano EXtracellular Water - Improve immune system health and reduce inflammation.

Ultimate Clinical Potency Curcumin - Natural pain relief, reduce inflammation and so much more.

MitoCopper - Bioavailable Copper destroys pathogens and gives you more energy. (See Blood Video)

Oxy Powder - Natural Colon Cleanser!  Cleans out toxic buildup with oxygen!

Nascent Iodine - Promotes detoxification, mental focus and thyroid health.

Smart Meter Cover -  Reduces Smart Meter radiation by 96%! (See Video).

Report abuse

    Comments

    Your Comments
    Question   Razz  Sad   Evil  Exclaim  Smile  Redface  Biggrin  Surprised  Eek   Confused   Cool  LOL   Mad   Twisted  Rolleyes   Wink  Idea  Arrow  Neutral  Cry   Mr. Green

    MOST RECENT
    Load more ...

    SignUp

    Login

    Newsletter

    Email this story
    Email this story

    If you really want to ban this commenter, please write down the reason:

    If you really want to disable all recommended stories, click on OK button. After that, you will be redirect to your options page.