Read the Beforeitsnews.com story here. Advertise at Before It's News here.
Profile image
Story Views
Now:
Last hour:
Last 24 hours:
Total:

Lucid Motors receives approval to build Phase 2 of Casa Grande factory

% of readers think this story is Fact. Add your two cents.


Lucid Motors has received approval from the Casa Grande City Council to begin the construction of the Phase 2 portion of its new electric vehicle manufacturing facility.

Lucid, an electric vehicle company based out of Newark, California, has been preparing for the initial production phases of the Lucid Air, the company’s first production vehicle. The EV will be built at the company’s Casa Grande, Arizona factory, which has been under construction since December 2019. The first phase was completed on December 1st, 2020, and is capable of delivering up to 30,000 vehicles annually. However, the company has planned an expansion since before the initial groundbreaking took place several winters ago.

After applying for an expansion, known as Phase 2, Casa Grande’s City Council approved the project on March 4th, which will ultimately see an expansion of 2,400,000 square feet.

Lucid’s Casa Grande Factory (Credit: Lucid)

The application for the site describes the project in detail:

“Lucid Motors, Inc. is planning to develop Phase 2 of a car manufacturing facility within the city of Casa Grande at the Southwest corner of Peters Road and Thorton Road. The proposed development encompasses ±500 acres of land in a portion of Section 36, Township 6, Range 5E, relative to the Gila and Salt River Base Line and Meridian in the City of Casa Grande, Arizona. More specifically, the disturbed area of the parcel is bounded by Phase 1 of the developed site immediately to the north, and underdeveloped land to the East, South, and West. In Phase 2, Lucid Motors is proposing to construct an approximate 2,400,000 SF of mechanical/industrial building space and approximately 3,000 parking spaces on approximately 152.36 acres. This plan set is to provide direction on the Phase 2 construction activities.

According to documents obtained by Teslarati, the Phase 2 expansion will consist of the following facilities:

  • Body in White Expansion
  • Stamping Plant
  • General Assembly
  • Powertrain Plant
  • General Warehousing
  • Several Supporting and Auxiliary Structures
  • Future phases will expand the existing buildings and add a Customer Experience Center

Kimley-Horn Planning and Design Engineering Consultants is listed as the acting Civil Engineer and Landscape Architect.

The project was approved conditionally on March 4th, 2021, with the Planning Commission requesting that Lucid perform the following revisions to the project before it will be allowed to break ground:

  • Extend pedestrian sidewalks to connect to Thornton Road sidewalk.
  • Provide additional landscape per table 17.36.060.
  • Meet all fire review comments regarding fire flow.
  • Provide Finalized Traffic Impact Analysis.
  • Provide Geotechnical reports reflecting specific building locations for caissons and vertical load.

Lucid details that the Phase 2 portion of its facility should begin later this year, “enabling production of Project Gravity, our premier SUV.” Recently, Lucid announced that it would delay the production of the Air until the second half of this year, Bloomberg reported initially. With the new Phase 2 beginning construction later this year, it plans to have a manufacturing capacity that will be “up to 400,000 annually,” the company said.

Recently, it was announced that Lucid had reached a merger agreement with Churchill Capital, a Special Purpose Acquisition Company (SPAC) that will take the electric automaker public.

The details of Lucid’s Phase 2 buildout are available below.

Lucid Phase 2 Plans Approved by Joey Klender on Scribd

The post Lucid Motors receives approval to build Phase 2 of Casa Grande factory appeared first on TESLARATI.


Source: https://www.teslarati.com/lucid-factory-casa-grande-phase-2-approved/


Before It’s News® is a community of individuals who report on what’s going on around them, from all around the world.

Anyone can join.
Anyone can contribute.
Anyone can become informed about their world.

"United We Stand" Click Here To Create Your Personal Citizen Journalist Account Today, Be Sure To Invite Your Friends.

Please Help Support BeforeitsNews by trying our Natural Health Products below!


Order by Phone at 888-809-8385 or online at https://mitocopper.com M - F 9am to 5pm EST

Order by Phone at 866-388-7003 or online at https://www.herbanomic.com M - F 9am to 5pm EST

Order by Phone at 866-388-7003 or online at https://www.herbanomics.com M - F 9am to 5pm EST


Humic & Fulvic Trace Minerals Complex - Nature's most important supplement! Vivid Dreams again!

HNEX HydroNano EXtracellular Water - Improve immune system health and reduce inflammation.

Ultimate Clinical Potency Curcumin - Natural pain relief, reduce inflammation and so much more.

MitoCopper - Bioavailable Copper destroys pathogens and gives you more energy. (See Blood Video)

Oxy Powder - Natural Colon Cleanser!  Cleans out toxic buildup with oxygen!

Nascent Iodine - Promotes detoxification, mental focus and thyroid health.

Smart Meter Cover -  Reduces Smart Meter radiation by 96%! (See Video).

Report abuse

    Comments

    Your Comments
    Question   Razz  Sad   Evil  Exclaim  Smile  Redface  Biggrin  Surprised  Eek   Confused   Cool  LOL   Mad   Twisted  Rolleyes   Wink  Idea  Arrow  Neutral  Cry   Mr. Green

    MOST RECENT
    Load more ...

    SignUp

    Login

    Newsletter

    Email this story
    Email this story

    If you really want to ban this commenter, please write down the reason:

    If you really want to disable all recommended stories, click on OK button. After that, you will be redirect to your options page.