Deja vu: Building an Off-Grid Log Cabin… Again

% of readers think this story is Fact. Add your two cents.


by Todd Walker

Three 21 foot logs, the crowning roof logs, lay on the ground debarked with pine sap oozing like beads of sweat. They would serve as my ridge pole and two top plate logs. Then it happened…

The landowner’s son, my good friend, walked to the cabin site and told me that the family was putting the land up for sale. I was shocked, not so much about the fate of my “practice” log cabin, but because he was raised on this beautiful land his entire life. He apologized about all the work that I had put into the cabin.

“It’s a practice cabin, buddy,” I said.

A year and a half of felling, bucking, skinning, stacking and pinning logs together. My options were limited. Let it sit unfinished and eventually rot to the ground. Or move it. DRG and I moved to the property across the road just a few months ago. Yep, that would be its new location.

Weeks before the news, I had arranged a work day with a group of our friends to finish up the walls. The building party turned into a demolition day. Each log was labeled and numbered to make reassembling the log puzzle less confusing. Stick by stick, the team worked all day to tear down 1.5 years of work, some of which they helped build.

Deja vu

After the dust settled, the job of rebuilding began. I figured reassembly would take less time. I was right.

Foundation

I decided to go back with dry-stack stone piers for the foundation. This would save money since the land had plenty of stones for stacking. Boulders I couldn’t physically lift, there were several, I used my rope come-a-long to inch them onto a trailer. My friend’s tractor would have made this task a breeze, but it was in the shop for repairs.

One lesson learned from the first stone foundation was I didn’t need to be exact on stacking each pier. I got them close to level using a water level and tweaked them as needed once the sill logs were on top. Dimensional lumber would require each pier to be exactly the same height. If you enjoy putting puzzles together, this job is for you.

Sill Logs

I needed to start stacking logs. The challenge was to transport the two 1,000 pound, 18 foot sill logs from the previous site to their new home. My log hauling operation consisted of Donkey Kong (4-wheeler) and Junior (LogRite Arch). This duo had successfully hauled all the other cabin logs across the creek, up a 75 yard incline which makes young men huff and puff, and across the road to my place.

I crossed my fingers and headed toward the creek with a sill log in-tow. Donkey Kong crossed the creek and stalled with its front tires off the ground. The opposite end of the long log was stuck on the other side of the creek. I knew then that I was in for a long afternoon of winching up a steep hill. After five winching episodes, we made it to the top! And in 90+ degree Georgia heat with high humidity. I was soaked.

I rebuilt my lifting tripod at the new site, hung the chain fall, and started setting sill logs. The first row is important and takes the longest to get set. To square the corners, the Pythagorean Theorem was used to form a 3-4-5 triangle at each corner.

Log Courses Going Up

Before disassembling the cabin, each log was labeled to make putting it back together a no-brainer. It’s like paint by numbers.

A fine sight!

Every log you see was felled and bucked with an ax, with a few back cuts using a one-man hand saw. Logs were debarked with a barking sud or draw knife. Most of the assembly on the original site was done with a brace and bit and sledge hammer. I chose this pioneer method the first time around. On the rebuild, I’m running power tools with a generator. The use of modern tools has sped up the process considerably. I even have a shop fan to move hot air around the new site.

Floor Joists

Those who have followed this log cabin build may remember the hand-hewn log floor joists on the first build. I made the decision to abandon this floor system. Why? Two reasons…

  • During disassembly, we discovered that one sill log notched to accept the floor joists had significant decay. This log came from a dead-standing pine tree which seemed to be solid. I opted to replace it with another log.
  • Even if the sill log had remained solid, I quickly realized that the alignment of the two notched sill logs had to be perfect to accept the hewn log joists.

Pressure treated lumber was used as joists. It was cheaper on some boards than non-treated. Plus, I’m not sure how long it’ll take to get a roof over the cabin. The old plywood subfloor was salvaged and tacked on the new joists as temporary flooring.

Installing flat boards on round logs had a few challenges. There are gaps between the two, some almost 1.5 inches. I used shims to keep the 2×8’s rim joists plumb. Six inch screws secured the joists where large gaps appeared. Joist hangers were set on 16 inch centers for the 10 foot run on the floor.

We’ll keep practicing until we finish this log cabin. We’ve been here before.

Keep Doing the Stuff of Self-Reliance,

~ Todd

P.S. – You can also keep up with the Stuff we’re Doing on TwitterPinterestYouTubeInstagram, and Facebook… and over at our Doing the Stuff Network.

P.P.S – If you find value in our blog, Dirt Road Girl and I would appreciate your vote on Top Prepper Sites! You can vote daily by clicking here or on the image below. Check out all the other value-adding sites while you’re there…

Thanks for Sharing the Stuff!

Copyright © by Survival Sherpa: Content on this site (unless the work of a third-party) may be shared freely in digital form, in part or whole, for non-commercial use with a link back to this site crediting the author. All links in articles must remain intact as originally posted in order to be republished. If you are interested a third-party article, please contact the author directly for republishing information.


Source: https://survivalsherpa.wordpress.com/2019/07/31/deja-vu-building-an-off-grid-log-cabin-again/


Before It’s News® is a community of individuals who report on what’s going on around them, from all around the world.

Anyone can join.
Anyone can contribute.
Anyone can become informed about their world.

"United We Stand" Click Here To Create Your Personal Citizen Journalist Account Today, Be Sure To Invite Your Friends.

Please Help Support BeforeitsNews by trying our Natural Health Products below!


Order by Phone at 888-809-8385 or online at https://mitocopper.com M - F 9am to 5pm EST

Order by Phone at 866-388-7003 or online at https://www.herbanomic.com M - F 9am to 5pm EST

Order by Phone at 866-388-7003 or online at https://www.herbanomics.com M - F 9am to 5pm EST


Humic & Fulvic Trace Minerals Complex - Nature's most important supplement! Vivid Dreams again!

HNEX HydroNano EXtracellular Water - Improve immune system health and reduce inflammation.

Ultimate Clinical Potency Curcumin - Natural pain relief, reduce inflammation and so much more.

MitoCopper - Bioavailable Copper destroys pathogens and gives you more energy. (See Blood Video)

Oxy Powder - Natural Colon Cleanser!  Cleans out toxic buildup with oxygen!

Nascent Iodine - Promotes detoxification, mental focus and thyroid health.

Smart Meter Cover -  Reduces Smart Meter radiation by 96%! (See Video).

Report abuse

    Comments

    Your Comments
    Question   Razz  Sad   Evil  Exclaim  Smile  Redface  Biggrin  Surprised  Eek   Confused   Cool  LOL   Mad   Twisted  Rolleyes   Wink  Idea  Arrow  Neutral  Cry   Mr. Green

    MOST RECENT
    Load more ...

    SignUp

    Login

    Newsletter

    Email this story
    Email this story

    If you really want to ban this commenter, please write down the reason:

    If you really want to disable all recommended stories, click on OK button. After that, you will be redirect to your options page.